PGHA Medians Improvement Project Phase 1 elements
(Completed 2010)
- The complete revamping of the irrigation system on the first median island on Riviera Drive.
- All new plantings and hardscape ground cover on the first island on Riviera Drive.
- A general cleanup of all remaining islands on Riviera Drive along with hardscape groundcover (no irrigation system exists on these islands).
- The complete revamping of the existing irrigation system on all median islands on Peacock Drive.
- All new plantings and hardscape ground cover on all islands on Peacock Drive.
- A general cleanup of the Biscayne Drive entry island
- The construction of the San Marino Drive entryway monument and sign.
- A general cleanup and hardscape ground cover on the San Marino Drive entryway area.
- Updated water distribution hardware and controllers.
also see: Medians Budget Phase 1
PGHA Medians Improvement Project Phase 2 elements
(Currently in planning stage)
- Removal and saving as applicable the existing hardscape ground cover on the Riviera Drive medians - numbers two through four.
- Excavation and street trenching associated with a water distribution network.
- All new drip/other irrigation infrastructure installed in the Riviera Drive medians and tied into the new water distribution network and irrigation electronic controllers.
- Soil augmentation to prepare for planting of approved shrubbery.
- Removal of selected volunteer shrubbery, pruning of existing olive trees as needed.
- Planting of selected shrubbery consistent with the existing appearance of the adjacent median.
- Replacement of hardscape ground cover on the Riviera Drive medians.
- Purchase and installation of solar powered up lighting for the entryway logo signs.